EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Project Details
Work Type: Safety Project
Phase: Design
Limits: North of Captain Hendry Dr to West of Forrey Dr
Length: 2.2 miles
City:
County:
Road:
Start of Current Phase: Mid 2023
Est. Completion of Current Phase: Mid 2025
About

English:
State Road 80 from North of Captain Hendry Drive to West of Forrey Drive is currently a four-lane urban highway divided by a two-way left-turn lane running east and west through the City of LaBelle in Hendry County. The posted speed limit varies between 35 and 40 miles per hour through the downtown area, and is 50 miles per hour near the project limits. The corridor includes sidewalks and bicycle lanes on both sides of the roadway.

This design project seeks to improve the safety and operations of SR 80 through LaBelle. The roadway modifications may include intersection reconfigurations, the addition of raised medians to the existing two-way left-turn lanes, and a new traffic signal at the intersection of Dr. Martin Luther King Blvd. Additional project elements include addressing any needed structural or drainage deficiencies. All project elements are anticipated to occur within the existing public right-of-way.

Español:

La Carretera Estatal 80, desde el Norte de Captain Hendry Drive hasta el Oeste de Forrey Drive, es actualmente una carretera urbana de cuatro carriles, dividida por un carril de giro a la izquierda de doble sentido que va de este a oeste a través de la ciudad de LaBelle. El límite de velocidad varía entre 35 y 40 millas por hora a través del área del centro de la ciudad, y es de 50 millas por hora cerca de los límites del proyecto. El corredor incluye aceras y carriles para bicicletas en ambos lados de la carretera.

Este proyecto de diseño tiene como objetivo mejorar la seguridad y las operaciones de la Carretera Estatal 80 a través de LaBelle. Las modificaciones de la carretera pueden incluir reconfiguraciones de intersecciones, incorporar separadores elevados a los carriles de giro a la izquierda de doble sentido existentes, y un nuevo semáforo en la intersección de Dr. Martin Luther King Blvd. Los elementos adicionales del proyecto incluyen cualquier deficiencia estructural o de drenaje que sea necesaria. Se anticipa que todos los elementos del proyecto ocurran dentro del derecho de vía público existente.

Public Involvement

Public engagement is scheduled to take place in multiple phases during 2025 according to the following schedule:

Public Workshop #1 - In-Person:
Date:
Tuesday, February 25, 2025, 4:00 pm - 7:00 pm
Location: LaBelle Civic Center, 481 W Hickpochee Ave, LaBelle, FL 33935
Format: Open House*
*No formal presentation was made, though a looped set of slides with project information was available for review at the meeting venue. Attendees were able to view project exhibits, ask questions, and discuss potential design solutions with members of the project team. 

Public Meeting #2 - In-Person:
Date:
Tuesday, April 22, 2025, 5:00 pm - 7:00 pm
Location: LaBelle Civic Center, 481 W Hickpochee Ave, LaBelle, FL 33935
Format: Presentation with Open House**
**The project team will share a presentation compiling the recommended design solutions developed in collaboration with the community. An open house session will follow.

Public Meeting #2 - Virtual:
Date:
Thursday, April 24, 2025, 5:00 pm - 6:00 pm
Location: Microsoft Teams Webinar
Registration (Required to Participate): https://bit.ly/3DONJeR
Format: Presentation with Q&A**
**The project team will share a presentation compiling the recommended design solutions developed in collaboration with the community. A question-and-answer session will follow.

All project materials will be made available on the project website.

Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability, or family status. Persons who require special accommodations under the Americans with Disabilities Act or persons who require translation services (free of charge) should contact Cynthia Sykes, District One Title VI Coordinator, at (863) 519-2287, or email at Cynthia.Sykes@dot.state.fl.us at least seven days prior to the meetings.

 

 

 

FAQs

For additional information on Proven Safety Countermeasures developed by the Federal Highway Administration and FDOT, please visit the following websites:

Medians and Pedestrian Refuge Islands in Urban and Suburban Areas

Reduced Left-Turn Conflict Intersections

Multimodal Access Management Guidebook 2023

 

View Factsheet
Contact Information
Design Project Manager
David Agacinski
239-225-1924
David.Agacinski@dot.state.fl.us
For Media Inquiries Only
fdot-d1comm@dot.state.fl.us
Events
  • Public Meeting #2: In-Person
    Date: Tuesday, April 22nd, 2025
    Start Time: 5:00 pm
    End Time: 7:00 pm

    The Florida Department of Transportation (FDOT), District One, invites you to participate in a public meeting for the State Road (SR) 80 Safety Improvements from North of Captain Hendry Dr. to West of Forrey Dr.

    For your convenience, the FDOT is providing multiple options for participation in the public meeting. A formal presentation will be made and followed by an open house. The current design plans will be available for review during the open house portion of the meeting. Attendees will be able to view project exhibits, ask questions, and review the updated design with members of the project team .

    The in-person meeting will take place on Tuesday, April 22, 2025, from 5:00 p.m. to 7:00 p.m. at the LaBelle Civic Center, 481 W Hickpochee Ave, LaBelle, FL 33935. No registration is necessary to participate in the in-person meeting.

    If you have questions or comments regarding the project, please visit the project website at https://www.swflroads.com/project/447878-1 or contact FDOT Project Manager, David Agacinski, by mail at 10041 Daniels Parkway, Fort Myers, FL 33913-7785, by phone at  (239) 225-1924 or by email at David.Agacinski@dot.state.fl.us. While you are able to provide written comments about the project at any time, only comments submitted by Friday May 2, 2025 will be included in the public record.

  • Public Meeting #2: Virtual
    Date: Thursday, April 24th, 2025
    Start Time: 5:00 pm
    End Time: 6:00 pm

    The Florida Department of Transportation (FDOT), District One, invites you to participate in a public meeting for the State Road (SR) 80 Safety Improvements from North of Captain Hendry Dr. to West of Forrey Dr.

    For your convenience, the FDOT is providing multiple options for participation in the public meeting. A formal presentation will be made and followed by a question and answer session. The current design plans will be available for review online during the meeting. Attendees will be able to view project exhibits, ask questions, and review the updated design with members of the project team .

    The virtual meeting will take place on Thursday, April 24, 2025 from 5:00 p.m. to 6:00 p.m. To participate in the virtual meeting, please register in advance by using the following link:
    Register for the Virtual Public Meeting

    If you have questions or comments regarding the project, please visit the project website at https://www.swflroads.com/project/447878-1 or contact FDOT Project Manager, David Agacinski, by mail at 10041 Daniels Parkway, Fort Myers, FL 33913-7785, by phone at  (239) 225-1924 or by email at David.Agacinski@dot.state.fl.us. While you are able to provide written comments about the project at any time, only comments submitted by Friday May 2, 2025 will be included in the public record.

Project Documents
Project Videos