Project Details
Phase: Construction
Limits: SR 683 (US 301) from 12th Street to Dr. Martin Luther King Jr. Way
Length: 0.75 miles
City:
County:
Road:
Start of Current Phase: Late 2024
Est. Completion of Current Phase: Mid 2025
About

The Florida Department of Transportation (FDOT), District One will begin improvements to multiple intersections along State Road (SR) 683 (US 301) in Sarasota County. The project was requested by FDOT's District One Traffic Safety Department and is intended to improve safety, enhance traffic flow, and reduce crashes.

The project includes implementing various improvements to four (4) intersections along SR 683 (US 301): 12th Street, 17th Street, 21st Street, and Dr. Martin Luther King Jr. Way. Improvements include adding signal heads, additional signage, and special emphasis crosswalks. Additional improvements include a proposed restricted crossing U-turn (RCUT) at the 21st Street intersection including Pedestrian Hybrid Beacons (PHB) on mast-arm assemblies.

NOTE:  To recover from delays due to Hurricane Helene and Milton, the construction schedule has begun  and required necessary adjustments.

  • The existing speed limit shall remain in effect for all traffic control areas, unless otherwise directed by the engineer. The posted speed limit on SR 683 (US301) is 45 MPH.
  • Motorists can expect day and night time lane closures.
  • Please consider alternate routes or add additional travel time. Travel time will be monitored.
Public Involvement

FDOT held a public meeting (online and in-person) on Thursday, August 25, 2022 to present project information and provide an opportunity for the public to offer feedback. Although the meeting comment period is officially closed, copies of the public meeting materials are available for viewing in the Project Documents section. A copy of the public meeting video presentation is available for viewing in the Project Videos section.

FDOT solicits public participation without regard to race, color, national origin, age, sex, religion, disability, or family status.

View Factsheet
Contact Information
Communications Team
Barbara Catlin
941-302-5048
barbara.catlin@dot.state.fl.us
For Media Inquiries Only
fdot-d1comm@dot.state.fl.us
RoadWatch
  • S 301 from 12th Street to Dr. Martin Luther King Way: Construction: Crews will begin intersection improvements along US 301 in Sarasota County. The project was requested by the Traffic Safety Department to improve safety and enhance traffic flow along the corridor. Improvements include adding signal heads, additional signage, and special emphasis crosswalks. Additional improvements include a proposed restricted crossing U-turn (RCUT) at the 21st Street intersection adding a Pedestrian Hybrid Beacon (PHB) on mast-arm assemblies.

    • Due to needed schedule changes after delays from Hurricanes Helene and Milton, daytime lane closures are allowable from 9 a.m. to 3 p.m. and overnight lane closures for paving. There will be a permanent merge lane closure at 12th Street turning right onto US 301 South. The intersection improvement project will go through late spring 2025.
    • Travel times will be monitored. Motorists may wish to add additional travel time or choose an alternate route.