EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Project Details
Work Type: Resurfacing
Phase: Construction
Limits: from SR 540 (Cypress Gardens Boulevard) to CR 546 (Kokomo Road)
Length: 5.4 miles
City:
County:
Road:
Construction Cost: $23.2 million
Est. Completion of Current Phase: Late 2024
About

The Florida Department of Transportation (FDOT) is improving the safety and rideability of US 27 from north of Cypress Gardens Boulevard to north of Kokomo Road in Davenport. Project improvements include:

  • Resurfacing US 27 and connecting side street entrances
  • Adding a new signal and improving the turn radius at Kokomo Road
  • Adding high-visibility crosswalks at Crump Road/West Main Street and at Kokomo Road
  • Replacing existing street light fixtures with LED light fixtures

Motorists can expect single lane closures during the day and double lane closures at night/overnight, so use caution, watch for equipment and workers close to the road, and be prepared to merge or stop.

 

View Factsheet
Contact Information
Communications Team
Sandra Mancil
863-519-4116
For Media Inquiries Only
fdot-d1comm@dot.state.fl.us
RoadWatch
  • Sunday, May 5 through, Saturday, May 11, 2024

    • Kokomo Road, from US 27 to Roberts Road, remains closed while crews rebuild the roadway approaching the intersection. Follow the posted detour using Roberts Road.
    • Watch for nighttime/overnight lane closures as crews begin paving the median crossovers throughout the project.
    • Expect a full time southbound outside lane closure from Dundee Road to Cypress Gardens Boulevard while crews work on shoulder widening, guardrail and drainage.
    • Use caution and be prepared to merge.
Project Documents