447434-1 SR 540 (Winter Lake Road) from US 98 to Polk Parkway
Project Details
About
A Florida Department of Transportation (FDOT) project to resurface Winter Lake Road from Bartow Road to the Polk Parkway began in late January. As part of construction the boat access at Saddle Creek has been closed and will remain closed permanently. Boaters should access Lake Hancock at the official Lake Hancock Boat Ramp located at Panther Point Trailhead off US 98.
- Milling and resurfacing the roadway and side street entrances
- Upgrading lighting and signal equipment at both Reynolds Road and US 98
- Widening the eastbound right-turn lanes at Polk State and at Discovery Drive to provide a keyhole bicycle lane
- Upgrading the pedestrian crossing and pedestrian signals at Reynolds Road
- Reconstruct driveway entrances at various locations
- Replacing guardrail throughout the project
- Closing the boat access at Saddle Creek
FAQs
Contact Information
Communications Team |
---|
Sandra Mancil
863-519-4116
Sandra.Mancil@dot.state.fl.us
|
For Media Inquiries Only |
fdot-d1comm@dot.state.fl.us
|
RoadWatch
-
Week of June 30 through July 6, 2024
This week, the contractor will be grading shoulders with nighttime/overnight lane closures and installing bases for pedestrian signals during the day. Use caution and watch for workers close to the road.