Project Details
Work Type: Milling and Resurfacing
Phase: Design
Limits: from E of Old Stokes Road to SR 25 (US 27) Slip Lane
Length: 1.36 miles
City:
County:
Road:
Start of Current Phase: Late 2021
Est. Completion of Current Phase: Late 2023
Estimated Costs
Construction Cost: $2,076,000.00
About

The proposed limits for this SR 700 (US 98) project begins at the pavement joint approximately 501 feet east of Old Stokes Road at MP 13.68 then proceeds 1.36 miles east along SR 700 to the westbound SR 25 (US 98) slip lane at MP 15.04. This is a Resurfacing, Restoration, and Rehabilitation (RRR) project that is intended to extend the service life of the existing roadway. The existing 12-foot lanes will be reduced to 11-foot to provide for 6-foot paved shoulders.

View Factsheet