EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

This project has been completed and is only available for historical reference.
Project Details
Work Type: Safety Project
Phase: Completed
Limits: Havendale Boulevard to Brigham Road
Length: 1.474 miles
City:
County:
Road:
Construction Cost: $2.76 million
About

 Safety improvements along US 17 from Havendale Boulevard / MLK Boulevard to Brigham Road in Winter Haven began in July 2022. Project Improvements include:

  • Add 6-foot sidewalks along both sides of US 17
  • Install new Pedestrian Hybrid Beacons (PHB) also known as High-Intensity Activated CrossWalk Signals (HAWK) with a raised pedestrian refuge in the median at New Beginnings High School
  • Remove paved shoulder on the west side of US 17 from Avenue V NW to Avenue W
  • Install new curb and gutter and repair existing curb and gutter along both sides of US 17
  • Modify entrances at several existing driveways to bring them to current standards
  • Upgrade transit stops
  • Install lighting and upgrade signal equipment
  • Improve drainage
View Factsheet
Contact Information
Communications Team
Sandra Mancil
863-519-4116
For Media Inquiries Only
fdot-d1comm@dot.state.fl.us
Project Documents
Project Videos