440237-1 SR 64 Over Sarasota Pass Anna Maria Draw Bridge Repair/Rehabilitation
Project Details
Work Type: | Bridge Repair |
---|---|
Phase: | Completed |
Length: | 0.53 miles |
City: | |
County: | |
Road: | |
Construction Cost: | $1,096,407.04 |
About
The Florida Department of Transportation (FDOT) will begin an approximately .59-mile bridge repair/rehabilitation project along the scenic drawbridge on SR 64, Manatee Avenue, over Sarasota Pass (Anna Maria Draw Bascule Bridge). The bridge spans Anna Maria Sound and connects Perico Island and Bradenton on the mainland to Holmes Beach on the island.
The bridge repair/rehabilitation improvements include coating steel members, restoring section loss on corroded steel members, repairing, adjusting and testing the mechanical system that raises and lowers the bridge’s bascule segments, performing crack injections, and cleaning corrosion and painting of the structure.
Overnight single-lane closures can be expected from 7 p.m. to 6 a.m.
Improvements
- Bridge repair/rehabilitation
- Restoring corroded steel members
- Repair/adjust/test mechanical systems
- Crack injections
- Cleaning and painting
Project Schedule
- Construction starts summer of 2023
- Expected completion is winter of 2023
- Expect overnight temporary lane closures
- Expect noise and light from construction equipment
- Estimated cost: $1.1 million
Contact Us
Barbara Catlin
Community Outreach Manager
Cell/Text (941) 302-5048
Barbara.catlin@dot.state.fl.us
FAQs
The bridge repair/rehabilitation improvements include coating steel members, restoring section loss on corroded steel members, repairing, adjusting and testing the mechanical system that raises and lowers the bridge’s bascule segments, performing crack injections, and cleaning corrosion and painting of the structure.
Overnight single-lane closures can be expected from 7 p.m. to 6 a.m.
Improvements
- Bridge repair/rehabilitation
- Restoring corroded steel members
- Repair/adjust/test mechanical systems
- Crack injections
- Cleaning and painting
Project Schedule
- Construction starts summer of 2023
- Expected completion is winter of 2023
- Expect overnight temporary lane closures
- Expect noise from construction equipment
- Estimated cost: $1.1 million
Barbara Catlin
Community Outreach Manager
Cell/Text (941) 302-5048