-
US 27 (SR 25) at SR 78 Intersection: Construction project: Crews will be reconstructing the intersection with concrete pavement. Other improvements include milling, resurfacing, drainage, guardrail, signing, and pavement markings. Please use caution in the area and watch for workers, traffic signage, detours, and equipment throughout the project.
SR 78 is closed between US 27 for roadway reconstruction, with the closure in effect through September 2, 2025. Both eastbound and westbound turn lanes from US 27 to SR 78 are also closed during this time. Traffic traveling to and from SR 78 should follow posted signage and use Industrial Drive as a detour route.
Estimated completion is fall 2025.