Project Details
Work Type: Resurfacing
Phase: Construction
Limits: U.S. 41/ State Road (S.R.) 45 from Edwards Drive to Magellan Drive, U.S. 41/S.R. 45 from south of General Spaatz Boulevard to North of Edwards Drive and U.S. 41/S.R. 45 over Bowlees Creek Bridge
Length: 2.5 miles
Construction Cost: $15.4 Million
About

The Florida Department of Transportation (FDOT) will begin milling and resurfacing U.S. 41/ State Road (S.R.) 45 from Edwards Drive to Magellan Drive,  U.S. 41/S.R. 45 from south of General Spaatz Boulevard to North of Edwards Drive and U.S. 41/S.R. 45 over Bowlees Creek Bridge. Improvements will also include median modifications, lighting, signalization, drainage, curb and gutter, and guardrail removal/replacement within the project limits. Part of the project will include median modifications to the center lane, where raised medians will be installed to increase safety and reduce conflict points along the corridor. The project spans just over 2.5 miles with an estimated project cost of $15.4 million.

Public Involvement

The Florida Department of Transportation (FDOT) District One held a public meeting
on Thursday, May 26, 2022. Archived documents from the meeting are available to view below.

FAQs

Improvements include:

•Milling and resurfacing

•Signage and pavement markings

•Guardrail removal/replacement

•Curb and gutter

•Sidewalk improvements

•Installation of raised concrete medians
 to increase safety

•Repaving of Bowlees Creek Bridge

•Signalization, lighting and drainage

View Factsheet
Contact Information
Communications Team
Barbara Catlin
941-302-5048
barbara.catlin@dot.state.fl.us
Communications Team
Nancy Morgan
941-720-6335
Nancy.morgan@dot.state.fl.us
For Media Inquiries Only
Archived Project Documents (These documents have been archived for reference and research purposes.)