444612-1 US 41 from Edwards Drive to Magellan Drive
Project Details
Phase: | Design |
---|---|
Length: | 2 miles |
Estimated Costs
Construction Cost: | $11.3 Million |
---|
About
The Florida Department of Transportation (FDOT) District One will be milling and resurfacing 2 miles
of roadway on US 41 between Edwards Drive and Magellan Drive, Manatee County. As part of this
project FDOT proposes replacing a two-way, turn lane intersection with a raised median to improve safety on
the roadway.
Expected start is fall 2023.
Public Involvement
The Florida Department of Transportation (FDOT) District One held a public meeting
on Thursday, May 26, as part of the design process for this milling and resurfacing project that includes a single median modification on US 41 from Edwards Drive to Magellan Drive.
Materials are available in the document section.
Contact Information
Design Project Manager |
---|
Kara Davis
863-519-2369
|
For Media Inquiries Only |
fdot-d1comm@dot.state.fl.us
|