Project Details
Work Type: Roundabout
Phase: Design
Limits: The intersection of SR 572 (Drane Field Rd) and Waring Road
Length: 0.5 miles
City:
County:
Road:
Design Cost: $1.1 million
Start of Current Phase: Mid 2020
Est. Completion of Current Phase: Mid 2023
About

The Florida Department of Transportation (FDOT), District One, is preparing design plans for a multi-lane roundabout at the intersection of SR 572 (Drane Field Road) and Waring Road in Polk County. These improvements will also include the removal of the existing mast arm traffic signals and the addition of storm sewers, inlets, closed flumes, and manholes for stormwater conveyance.

The typical section for the proposed project consists of a mult-lane roundabout with travel lanes that vary from 12 to 14 feet, a 170-foot diameter, and 16-foot to 32-foot wide circulating roadway. The drainage will be a combination of a closed system utilizing curb and gutter and an open system with roadside ditches.

View Factsheet
Contact Information
Design Project Manager
Scott McCall
(863) 519-2277
For Media Inquiries Only
fdot-d1comm@dot.state.fl.us
Project Documents
Project Images
Project Intersection
Facing the project intersection from the south side on Waring Road
Facing south on the south side of Waring Road
Facing east on Waring Road at the intersection
Facing east on the west side of the intersection on SR 572
Approaching the Polk Parkway from the north side of the intersection