Project Details
Work Type: Widening
Phase: Construction
Limits: Fruitville Road from Honore Avenue to east of Coburn Road and reconstruction of the I-75 / Fruitville Road Interchange (including ramps)
City:
County:
Road:
Construction Cost: $86 Million Estimated
Start of Current Phase: Early 2024
Est. Completion of Current Phase: Early 2027
About

The Florida Department of Transportation (FDOT), along with Sarasota County, has identified the need to make improvements to the I-75 / Fruitville Road (SR 780) interchange to improve highway operations, safety, and regional mobility.

This design project includes reconstruction of the interchange at Fruitville Road in Sarasota County. The Department will rebuild the interchange from the existing partial cloverleaf design to a diverging diamond interchange (DDI). The DDI shifts eastbound traffic to the left to allow for improved access to northbound I-75 and shifts westbound traffic to the left to allow for improved access to southbound I-75. This approach reduces the number of phases for the signals and improves delay times. A similar type of interchange has recently been constructed and is now in operation at I-75 / University Parkway, which is the next interchange north of this project.

The project will widen about 2 miles of I-75, from Palmer Boulevard to north of Fruitville Road, to a six-lane highway with three through lanes per direction and will replace the existing bridges over Fruitville Road. The project also includes widening of about 1.6 miles of Fruitville Road from Honore Avenue to east of Coburn Road.

A future ultimate I-75 design project will widen the interstate from interim six lanes to ten lanes. The project includes two express lanes and three general use lanes in each direction within the project limits. Ultimate improvements are planned to extend acceptable level of service for I-75 well beyond 2050.
 

View Factsheet
Contact Information
Communications Team
Brian Bollas
813-262-8549
Brian.Bollas@atkinsglobal.com
Construction Project Manager
Marlena Gore
(863) 272-5008
Marlena.Gore@dot.state.fl.us
For Media Inquiries Only
fdot-d1comm@dot.state.fl.us
Project Documents
Project Videos